1
1
1VAAS12020-07-16 12:42:15
CMS
1VAAS1, 2020-07-16 12:42:15

How long does the layout and stretching of an online store on CMS take on average?

Good afternoon. How long does it take on average for a vertska and a stretch on the store's CMS? I recently interviewed in a small studio, so they said 3-4 days per eye should be enough, basically, this is opencart 3, despite the fact that on average it takes me 7 days for 8 hours, I really can’t go faster. Is the problem me or is it the requirement?

Answer the question

In order to leave comments, you need to log in

9 answer(s)
D
dmitry-toster, 2020-07-16
@dmitry-toster

A week is quite an adequate period for itself, and this is only for layout, what kind of stretch are you talking about in 3 days!? I speak as a person who "pulled" a single store. Layout of a unique design = a week + stretching the same amount. Total 2 weeks for a full-fledged store at least. Do not forget about filters in the search for products, tabs, accordions, and so on. dynamic whistles that do not always make sense to make up, but to change the styles of ready-made plugins of these CMS, which in time may be longer than doing it yourself from scratch

S
Sanes, 2020-07-16
@Sanes

Depends on the number of processed modules. If this is a 100% alteration, then you can’t even integrate it into a simple store during this time.
In 3-4 days you will have 90% of the default template with minor edits.

C
chenado, 2020-07-17
@chenado

Fuck generally work for an uncle, in this industry you can move alone, develop and earn.
I'm a salesman myself and my own hoster and designer with a layout designer, as they say: Both a schnets and a reaper, and generally piz ....

X
xmoonlight, 2020-07-16
@xmoonlight

It all depends on the layout and the required functionality.
2-3 weeks is a minimum and qualitatively.

M
Maxim Pak, 2020-07-17
@PML

Depends on requirements.
It is possible to launch in 1 day, the most banal.
And so the layout of the general frame and elements from 3 days. Further from 4 hours per page.
Integration depends on functional requirements. And so, the transfer of layout from 4 hours a page.
Each project has individual deadlines. Also, in addition to the requirements, it depends on the developer, his experience.

V
vladvector, 2020-07-23
@vladvector

Run away from such studios that are looking after their ass for a penny. You won’t gain experience there either, but leave your health, so for you there is no benefit in such a proposal from the word “absolutely”.

N
Nb8, 2020-07-17
@Nb8

And why is it so long with the shops, they are all the same? Or do you make an epically original design every time from scratch, in a small studio? Change the wallpaper, tweak the shapes a bit and you're done.

G
Gorila Lopster, 2020-07-17
@gorilalopster

Of course it is possible if the studio does it)

A
Andrey Raboy, 2020-07-17
@raba

In general, 15 minutes, the logo has changed and you're done!
Damn, 2 weeks is the standard time, usually longer, customers will want some more arrival that will blow everyone's mind.

Didn't find what you were looking for?

Ask your question

Ask a Question

731 491 924 answers to any question