What is the power supply scheme of the rack in this case?
Good afternoon, help a neophyte understand the power supply circuit.
Before that, I met with schemes for ensuring power supply fault tolerance by using UPS. There are 2 electrical panels with automation in the server room, power comes to the panels from two substations + there are several diesel generators, from which a backup line goes to each panel. There is one line from each shield to each rack, but there are no UPS in the rack, but there are only ordinary rack pilots (without a button). How is fault tolerance implemented in this case? Why draw lines from two shields? After all, 1 pilot can be recorded with only 1 line? And if you put it in the pilot and record each from different shields, then the servers have 1 power supply with one output, why it can only be plugged into one pilot.
The main question is why in this case draw lines from 2 shields and how can they be combined?
Answer the question
In order to leave comments, you need to log in
Didn't find what you were looking for?
Ask your questionAsk a Question
731 491 924 answers to any question